Title      

Description

Format

 

 

 

Shop Fabrication Piping Tonnage Estimate Instructions (Word)

This excel tool was developed to provide a simple method for use early in the project (before any piping layout) to estimate pipe fabrication tonnage based on 80 to 90% P&IDs. 

By James O. Pennock & Raymond Metsalaar

.doc

 

 

 

Shop Fabrication Piping Tonnage Estimate Form

Tonnage Estimate Form Imperial & Metric (Excel)    

.xls

 

 

   


About the Author

{cb}

{/cb} {cb:[cb:userfield field="cb_biography" user="4973" /]}

Log in to comment
Category: Section 13 - Pipe Fabrication Shop Issues