12 years 7 months ago - 12 years 7 months ago #6431 by Jop
Do it once and Do it Right
Replied by Jop on topic Re: P&IDs Review by Piping Engineers in an EPC project
There are two reasons for a "Spec Break" in piping.
The first reason for a Spec Break is a change in Pressure and therefore flange rating (higher rating down to a lower rating)
The second reason for a Spec Break is a change in Material (example: Stainless Steel to Carbon Steel)
Therefore you DO need a "Spec Break" even though there is no change in the basic flange class rating.
The first reason for a Spec Break is a change in Pressure and therefore flange rating (higher rating down to a lower rating)
The second reason for a Spec Break is a change in Material (example: Stainless Steel to Carbon Steel)
Therefore you DO need a "Spec Break" even though there is no change in the basic flange class rating.
Do it once and Do it Right
Please Log in or Create an account to join the conversation.