field weld

More
16 years 9 months ago - 16 years 9 months ago #4053 by Anton
Replied by Anton on topic Also, on FFW, I find,
Also, on FFW, I find, when fitting up to equipment where final certified vendor data is not available, it is helpful to leave 3 FFW's at the fitup end of the line.
1 in N-S direction,
1 in E-W direction,
and
1 in Elevation.

This will allow for the final connection, in all planes, when the equipment arrives on site.

This can also be allowed for by running the line to within 1 metre (or so) of the equipment and have the fitter "field run" from this point.

- If you're the smartest person in the room ... you're in the wrong room.

Please Log in or Create an account to join the conversation.

More
16 years 9 months ago - 16 years 9 months ago #4061 by EliutBB
Replied by EliutBB on topic Hello guys, I concur with Jop:
Hello guys,

I concur with Jop:
"With this in mind I do not recommend a (default) field weld at every platform penatration. It would be unneccessary and would add extra cost to the project"

I usually just tell the civil people that I want a hole on the grating, the size and where I want it, sometimes you might need a support (at the grating elevation, supported on the srtucture) there and have to tell them that its not a standard hole.

I allways thought that FFW's were necessary where you need or are not sure of the final longitud, for example if you are going up (or down from) to the rack.

And I think there is one more, you put FW's on small sized branches, drains etc because handling from shop to the field might damage them.

Cheers!
Eliut

Please Log in or Create an account to join the conversation.

Moderators: Jop